Scope · PEP · Plot Plan · FragnetsEngineering + supply-chain logic included
✦PLANNING COPILOT / DEMO READOUTPlanner-reviewed support
The plan is controlled by the equipment delivery gate.
GPT has connected procurement, field sequence, and turnover into one controlling-chain explanation. The long-lead equipment gate is the conversation to have first.
CONTROLLING CHAIN
Vendor→Delivery→Install→Test / handover
ASK THE PLAN
GPT READOUT
The long-lead equipment gate controls the finish.
Vendor manufacturing runs into the equipment delivery gate. Testing and turnover have little float after the equipment is installed.
LOGIC LENS
Follow the plan as a chain of decisions
Every node is a proposed handoff. Select one to see what it controls.
PROJECT LOGIC / FIRST PASS5 linked handoffs
→
→
→
→
SELECTED HANDOFF / 04
Equipment delivery
If this date moves, the installation gate and every downstream commissioning handoff move with it.
SCENARIO EFFECTNo change
PROJECT PULSE
Four moments the project lead can act on
A visual readout of what is happening, what is gated, and what deserves attention.
Control cableFunctional testingSubstantial completion
Turnover under pressureCommissioning
SCENARIO LAB
Move one lever. Watch the plan explain itself.
Test the vendor manufacturing window and carry the consequence into delivery, testing, Story Board, and Supply Chain.
180daysbaseline duration
120d / aggressive180d / baseline
FORECAST SHIFTNov 18, 2027+34d after required finish
vendordeliveryturnover
PLANNING CHECKS
What the model wants a planner to review
LONG-LEADEquipment deliveryProtect the gate
RECOVERYVendor durationBaseline
PARALLELCivil + vendorOpportunity
PRESSURETesting / turnoverReview
Concept demonstration using synthetic project data. The schedule view is a planning-support layer; approved project controls and qualified human review remain authoritative.