AI SCHEDULING / CONCEPT DEMONSTRATIONScheduler Intelligence — Demo
DEMO DATA
GPT-ASSISTED FIRST-PASS PLANNING

Schedule Intelligence

See the logic, pressure points, and recovery levers behind the proposed plan.

REVIEW REQUIRED+34dforecast variance
PROJECT INTAKE / SOURCE-TO-SCHEDULE

Start with the project evidence—not a blank schedule.

Load the synthetic package to see what the agent extracts, proposes, and sends to a planner for approval.

XER
P6 scheduleWaiting to load
PDF
Project Execution PlanWaiting to load
CAD
Plot planWaiting to load
LIB
Proven fragnetsWaiting to load
Wellmont SubstationHigh-voltage substation · synthetic demo
01 Sep 2026 — 15 Oct 2027Required completion date
Scope · PEP · Plot Plan · FragnetsEngineering + supply-chain logic included
PLANNING COPILOT / DEMO READOUTPlanner-reviewed support

The plan is controlled by the equipment delivery gate.

GPT has connected procurement, field sequence, and turnover into one controlling-chain explanation. The long-lead equipment gate is the conversation to have first.

CONTROLLING CHAIN
VendorDeliveryInstallTest / handover
ASK THE PLAN
GPT READOUT

The long-lead equipment gate controls the finish.

Vendor manufacturing runs into the equipment delivery gate. Testing and turnover have little float after the equipment is installed.

LOGIC LENS

Follow the plan as a chain of decisions

Every node is a proposed handoff. Select one to see what it controls.

PROJECT LOGIC / FIRST PASS5 linked handoffs
SELECTED HANDOFF / 04

Equipment delivery

If this date moves, the installation gate and every downstream commissioning handoff move with it.

SCENARIO EFFECTNo change
PROJECT PULSE

Four moments the project lead can act on

A visual readout of what is happening, what is gated, and what deserves attention.

active workstream pressure
01SEP — NOV 26

Define & buy

Technical requirementsRFQ packageBid evaluation
Award window opensSupply chain
02DEC 26 — MAR 27

Build in parallel

Civil foundationsUnderground scopeVendor manufacturing
Two workfronts activeConstruction
03APR — AUG 27

Raise & receive

Steel structuresMajor equipmentSet equipment
Delivery gateCritical gate
04SEP — NOV 27

Prove & hand over

Control cableFunctional testingSubstantial completion
Turnover under pressureCommissioning
SCENARIO LAB

Move one lever. Watch the plan explain itself.

Test the vendor manufacturing window and carry the consequence into delivery, testing, Story Board, and Supply Chain.

180daysbaseline duration
120d / aggressive180d / baseline
FORECAST SHIFTNov 18, 2027+34d after required finish
vendordeliveryturnover
PLANNING CHECKS

What the model wants a planner to review

LONG-LEADEquipment deliveryProtect the gate
RECOVERYVendor durationBaseline
PARALLELCivil + vendorOpportunity
PRESSURETesting / turnoverReview

Concept demonstration using synthetic project data. The schedule view is a planning-support layer; approved project controls and qualified human review remain authoritative.

Focused concept demonstration using synthetic data. Approved controls and qualified human review remain authoritative.